how to run a simulation at different times
2 views (last 30 days)
Show older comments
I would like to run my model, lets say 3 days at 40C temperature and 4days at 60C and so on.
As per my understanding and trail, i have used a if block and merge the signals, is it right?
how can i change that time and input value to simulate? iw ould like to see how it's changing with time and temperature.
have a look at the attachments for better view, any views and guidance?
0 Comments
Answers (1)
Benjamin Thompson
on 10 Oct 2022
You can use the Signal Builder block to configure how you want a signal to change over time. I assume you are simulating the model one time for seven days total.