ashkan toopshekan - MATLAB Central
photo

ashkan toopshekan


Last seen: 5 months ago Active since 2024

Followers: 1   Following: 0

PhD of energy systems engineering

Programming Languages:
MATLAB

Statistics

File ExchangeFrom 01/24 to 05/25Use left and right arrows to move selectionFrom 01/24Use left and right arrows to move left selectionTo 05/25Use left and right arrows to move right selectionUse TAB to select grip buttons or left and right arrows to change selection100%
File Exchange

1 File

RANK
N/A
of 298,512

REPUTATION
N/A

CONTRIBUTIONS
0 Questions
0 Answers

ANSWER ACCEPTANCE
0.00%

VOTES RECEIVED
0

RANK
11,994 of 20,606

REPUTATION
35

AVERAGE RATING
5.00

CONTRIBUTIONS
1 File

DOWNLOADS
23

ALL TIME DOWNLOADS
304

RANK

of 161,536

CONTRIBUTIONS
0 Problems
0 Solutions

SCORE
0

NUMBER OF BADGES
0

CONTRIBUTIONS
0 Posts

CONTRIBUTIONS
0 Public Channels

AVERAGE RATING

CONTRIBUTIONS
0 Highlights

AVERAGE NO. OF LIKES

  • 5-Star Galaxy Level 1
  • Personal Best Downloads Level 1
  • First Submission

View badges

Feeds

View by

Submitted


Electrical load prediction using LSTM
prediction of next 720 iteration (1 month) electrical load using a 1 year data.

1 year ago | 23 downloads |

0.0 / 5
Thumbnail