summary
Report on failures and severity for basic expected shortfall (ES)
Syntax
Description
Examples
Generate an ES Summary Report
Create an esbacktest
object.
load ESBacktestData ebt = esbacktest(Returns,VaRModel1,ESModel1,'VaRLevel',VaRLevel)
ebt = esbacktest with properties: PortfolioData: [1966x1 double] VaRData: [1966x1 double] ESData: [1966x1 double] Time: [1966x1 double] PortfolioID: "Portfolio" VaRID: "VaR" VaRLevel: 0.9750
Generate the ES summary report.
S = summary(ebt)
S=1×11 table
PortfolioID VaRID VaRLevel ObservedLevel ExpectedSeverity ObservedSeverity Observations Failures Expected Ratio Missing
___________ _____ ________ _____________ ________________ ________________ ____________ ________ ________ ______ _______
"Portfolio" "VaR" 0.975 0.97101 1.1928 1.4221 1966 57 49.15 1.1597 0
Input Arguments
ebt
— esbacktest
object
object
esbacktest
(ebt
) object, contains a
copy of the given data (the PortfolioData
,
VarData
, and ESData
properties)
and all combinations of portfolio ID, VaR ID, and VaR levels to be tested.
For more information on creating an esbacktest
object,
see esbacktest
.
Output Arguments
S
— Summary report
table
Summary report, returned as a table. The table rows correspond to all combinations of portfolio ID, VaR ID, and VaR levels to be tested. The columns correspond to the following information:
'PortfolioID'
— Portfolio ID for the given data'VaRID'
— VaR ID for each of the VaR data columns provided'VaRLevel'
— VaR level for the corresponding VaR data column'ObservedLevel'
— Observed confidence level, defined as the number of periods without failures divided by number of observations'ExpectedSeverity'
— Expected average severity ratio, that is, the average ratio of ES to VaR over the periods with VaR failures'ObservedSeverity'
— Observed average severity ratio, that is, the average ratio of loss to VaR over the periods with VaR failures'Observations'
— Number of observations, where missing values are removed from the data'Failures'
— Number of failures, where a failure occurs whenever the loss (negative of portfolio data) exceeds the VaR'Expected'
— Expected number of failures, defined as the number of observations multiplied by 1 minus the VaR level'Ratio'
— Ratio of number of failures to expected number of failures'Missing'
— Number of periods with missing values removed from the sampleNote
The
'ExpectedSeverity'
and'ObservedSeverity'
ratios are undefined (NaN
) when there are no VaR failures in the data.
Version History
Introduced in R2017b
MATLAB Command
You clicked a link that corresponds to this MATLAB command:
Run the command by entering it in the MATLAB Command Window. Web browsers do not support MATLAB commands.
Select a Web Site
Choose a web site to get translated content where available and see local events and offers. Based on your location, we recommend that you select: .
You can also select a web site from the following list
How to Get Best Site Performance
Select the China site (in Chinese or English) for best site performance. Other MathWorks country sites are not optimized for visits from your location.
Americas
- América Latina (Español)
- Canada (English)
- United States (English)
Europe
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
Asia Pacific
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)