Main Content

RF Simulation

R2026b
5G NR RF system simulation

5G Toolbox™ enables you to characterize the impact of radio frequency (RF) impairments in NR transmitters and receivers.

Apps

5G Waveform GeneratorCreate, impair, visualize, and export 5G NR waveforms

Functions

nrPhaseNoiseAdd NR phase noise to signal (Since R2026a)

Blocks

Waveform From Wireless Waveform Generator App blockWaveform From Wireless Waveform Generator AppWireless waveform source exported to Simulink

Featured Examples