nrEVM
Syntax
Description
[
measures the EVM for the specified carrier configuration, rmsEVM,peakEVM,infoEVM] = nrEVM(carrier,channel,rxGrid)carrier,
channel configuration, channel, and received grid,
rxGrid. The function performs channel estimation using the
reference signals, zero-forcing (ZF) equalization, reference data symbol reconstruction
using hard slicing, and then measures the EVM using equalized and reconstructed symbols.
rmsEVM is the root mean square (RMS) EVM.
peakEVM is the peak EVM. infoEVM is a
structure containing information about the EVM processing. Use this syntax for
single-slot EVM processing.
Examples
Input Arguments
Output Arguments
Extended Capabilities
Version History
Introduced in R2025a

