Testing Generated Code for a Battery Management System (BMS) | Verifying, Validating, and Testing Battery Management Systems, Part 7
From the series: Verifying, Validating, and Testing Battery Management Systems
See how to conduct software-in-the-loop (SIL) and processor-in-the-loop (PIL) testing for code generated from a battery management system (BMS)
Re-use model tests to verify the code coverage and numerical equivalence of the generated code with respect to the Simulink model.
Published: 15 Mar 2020
Select a Web Site
Choose a web site to get translated content where available and see local events and offers. Based on your location, we recommend that you select: .
You can also select a web site from the following list
How to Get Best Site Performance
Select the China site (in Chinese or English) for best site performance. Other MathWorks country sites are not optimized for visits from your location.
Americas
- América Latina (Español)
- Canada (English)
- United States (English)
Europe
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
Asia Pacific
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)